Projects

The following are major projects undertaken by Anhasi Contracting Services Limited subcontracted to us by Premium Services Contracting Limited and Breton Engineering and Construction.

Jan 2016 – Present
Housing Development Corporation (HDC)
Finishing works of single-family units (71), townhouse units (26) at Lions gate Housing Development, Egypt Extension Chaguanas. (including all electrical, plumbing, tiling and interior decorating works)
Jan 2016 – Present
Jan 2016 – Present
Interior Works
Construction of modern outfitted department stores and retail outlets, including Optometrist’s Today, Hip Hop fashions, True Value Supermarket. These works comprised of extensive gypsum, plumbing, electrical, joinery, tiling/flooring and specialized painting under impeccable supervision.
Jan 2016 – Present
Jan 2016-Present
Metal Industries Company
Construction of Playground in Pleasantville, Painting of 5 Buildings at Point Fortin, construction of cafeteria at Arima.
Jan 2016-Present
March 2017- Present
REX KAR Limited
Construction of multiple warehousing facilities, which entailed all foundation work, electrical, plumbing, roof works and re-paving the entire car park.
March 2017- Present
January 2018 – June 2018
Paving & infrastructure Works
Foundation to finish
January 2018 – June 2018
July 2018
Underground Electrical Installation at Good Wood Park
Excavation work, preparation, sanding of trenches, laying of docks, danger slab and construction of Padmoubt Transformer Plinth and resurfacing
July 2018
August 2018 – October 2018
Electrical Installation at Barataria Shopping Complex.
Extensive infrastructure and Excavation work, preparation, sanding of trenches, laying of docks, danger slab and construction of Padmoubt Transformer Plinth and resurfacing.
August 2018 – October 2018
January 2019
Electrical Installation for Transit Shelters.
Construction of 10 x 12 Low Voltage Room with 3 x 3 Pull Box Construction of 500 KWA Transformer Plinths Construction of High Voltage Room (Laying of Docks and Earthling of Room)
January 2019
May 2019 – August 2019
Covered Box Drains
Construction of 1500 x 1500 covered box drain Inclusive of catch pit and RCCP crossings
May 2019 – August 2019
September 2019 – December 2019
Arima Box Drain
Construction of box drains and road stabilization works
September 2019 – December 2019

Need an Estimate?

Send us details of your project and we would be happy to send you a quote. Or give us a call for further details.